Public Works Administration

Origins and Establishment

The Public Works Administration (PWA) was born from the National Industrial Recovery Act (NIRA) signed into law on June 16, 1933, during the Great Depression. The PWA aimed to revive the economy by creating jobs and building lasting infrastructure.1 Unlike Herbert Hoover, who believed in projects that paid for themselves over time, Franklin D. Roosevelt saw immediate public employment as a booster shot for the economy, regardless of immediate returns.

The NIRA allocated $3.3 billion for public works initiatives. Roosevelt envisioned the PWA not just as a maker of roads and dams but as a symbol of national recovery. Harold Ickes, a man of scrupulous character, was chosen to lead the PWA. Ickes demanded extreme diligence from his team to avoid corruption, but his cautious nature often meant that projects moved slowly as each proposal went through rigorous scrutiny.

The PWA encountered significant challenges right out of the gate. The sluggish approval process delayed many crucial projects, making it difficult for the PWA to make a dent in the swelling unemployment numbers. Major endeavors like the Grand Coulee Dam and the Chicago Subway eventually got the green light, but these projects often employed private contractors who didn't necessarily pass on jobs to the people most in need.

In North Carolina, the PWA faced resistance from state and local governments heavily influenced by private business interests. The Duke Power Company, for instance, went to great lengths to block PWA-sponsored bills that threatened to create taxpayer-funded municipal power plants, which they saw as unfair competition.2

Ickes fought against these local roadblocks, but many proposed projects were stymied or altered beyond recognition by political maneuvering. This struggle was emblematic of the PWA's broader disconnect between an ambitious federal vision and local realities.

While the PWA created long-lasting infrastructure and did employ thousands, its effectiveness as a tool for immediate relief was limited. Nonetheless, its creation marked an important experiment in federal intervention and set the groundwork for future New Deal programs.

Black and white portrait of Harold Ickes, director of the Public Works Administration. He is a balding, bespectacled man in his 50s, wearing a dark suit and tie, and looking directly at the camera with a serious, determined expression.

Major Projects and Achievements

Between 1933 and 1939, the Public Works Administration embarked on an unprecedented spree of construction, drastically reshaping the American landscape. In total, it funded more than 34,000 projects, creating infrastructure that would prove critical for America's future growth.3

The PWA financed and oversaw the construction of thousands of miles of roads, which stitched together a nation previously carved up by regional disparities. The Pennsylvania Turnpike, often lauded as America's first superhighway, was one such example. This ambitious road project provided jobs and revolutionized transportation, making interstate travel more efficient and stimulating economic activity in previously isolated regions.

Approximately 70 percent of the new schools built during this period were PWA-funded, ensuring that the next generation had access to safer and more effective learning environments. Cities such as New York, Los Angeles, and Chicago saw a surge of new school buildings, many of which are still in use today.

Around one-third of the hospitals built in this window were thanks to PWA funding. Notable projects included:

  • The expansion of the Allegheny General Hospital in Pittsburgh
  • The construction of several rural hospitals, which provided critical healthcare services to underserved areas

The PWA funded the development of numerous airports, including major hubs like LaGuardia Airport in New York City. By improving air transport infrastructure, the PWA helped to connect the country in ways previously unimaginable, setting the stage for the rapid growth of both passenger and freight air transport in the following decades.

Electrification initiatives, such as the electrification of the Pennsylvania Railroad, and the construction of hydroelectric dams, including the Grand Coulee Dam and the Hoover Dam, were crucial. These projects supplied the burgeoning industries with the power needed to flourish, particularly during the war years and beyond.

In rural regions, the PWA tackled projects to improve everyday life, including:

  • Paving roads
  • Building bridges
  • Constructing water treatment facilities
  • Modernizing essential services

These projects collectively enhanced the quality of life, reduced isolation, and made rural areas more attractive for future economic investments.

The immediate impacts of these projects were tangible. They provided jobs to thousands, reduced unemployment, and buoyed industries related to construction and materials manufacturing. However, the long-term benefits were even more profound. Roads, bridges, schools, hospitals, and dams remain fixtures of modern American society, many decades after their construction. Such durable infrastructure formed the bedrock of economic recovery post-Depression and greatly contributed to the national war effort during World War II.

The PWA, for all its procedural delays and obstacles, managed to engineer an infrastructure renaissance. It demonstrated the potential of federal intervention in large-scale public works and left a lasting legacy on the American economic and social landscape.

Black and white photograph showing construction workers building one of the terminals at New York City's LaGuardia Airport in the 1930s. Men are visible working on scaffolding around the emerging shell of the distinctive art deco terminal building.

Challenges and Criticisms

The implementation of the Public Works Administration (PWA) faced a number of challenges and criticisms. One of the most significant hurdles was the notoriously slow project approval process. Under the rigorous inspection mandated by Harold Ickes, project proposals underwent exhaustive scrutiny to prevent any form of corruption or misuse of funds. While this vigilance helped maintain transparency, it also hampered the PWA's ability to deliver timely relief. Many projects dragged on for extended periods before getting the green light, which meant that immediate job creation, a primary goal, often lagged behind expectations.

The Grand Coulee Dam project, despite its immense eventual benefits, saw delays that frustrated both workers and policymakers alike. These delays were compounded by resistance from state and local governments that were hesitant to cooperate, either due to ideological differences or under pressure from private business interests.

In North Carolina, local political dynamics significantly stymied the PWA's goals. The Duke Power Company's aggressive lobbying against PWA-sponsored bills demonstrated how powerful private interests could derail federal initiatives. The company's successful campaign to block bills that would facilitate municipal cooperation with the PWA underscored the tug-of-war between federal aspirations and local vested interests.

Some local and state politicians viewed the PWA's interventions as overreach by the federal government into their territories. This was especially evident in states with strong private business lobbies that saw public works projects as competition to their operations. The backlash from these entities often translated into political maneuvering that obstructed or diluted the impact of proposed projects.

Critics also pointed out that the PWA was perceived as inefficient. While the administration was able to complete thousands of projects, many of these undertakings were either too small-scale or lacked comprehensive planning to significantly affect the national unemployment rate or stimulate widespread economic recovery. The initial belief that pumping money into public works would be an economic panacea was met with skepticism as the PWA's projects, though monumental in scope, did not quickly resolve the core issues of the Great Depression.

There was also a persistent undercurrent of allegations that the PWA was politically biased. Detractors claimed that projects were often awarded in ways that reflected political favoritism rather than objective need. There were accusations that Democratic-leaning areas received more PWA projects, a claim that Ickes and other PWA leaders constantly had to fend off.4 This perception of bias undermined the broader goal of the New Deal—to unify the nation through equitable economic recovery.

The effectiveness of the PWA was also curtailed by economic realities. Despite the impressive scale of its projects, the broader macroeconomic conditions required far more robust interventions than the PWA alone could provide. The simultaneous necessity to maintain fiscal conservatism, as endorsed personally by Roosevelt, meant that truly colossal spending initiatives were often scaled back or diluted.

In summary, while the PWA undoubtedly left a lasting legacy with its ambitious infrastructure projects, it faced numerous headwinds that hampered its mission. Accusations of inefficiency, political bias, and the internal friction caused by a slow-moving approval process revealed the intricacies of traversing federal-local dynamics and the inherent challenges in large-scale governmental programs. The PWA's journey thus serves as a vital historical lesson in the perennial struggle between idealism and pragmatism in public policy.

Exterior view of the North Carolina State Capitol building in Raleigh. The stately Greek revival structure features a central dome and is surrounded by leafy trees.

Comparison with Other New Deal Programs

In comparing the Public Works Administration (PWA) with other New Deal programs such as the Works Progress Administration (WPA) and the Civil Works Administration (CWA), we can see how these initiatives, though fundamentally aimed at economic recovery and employment, differed significantly in their approaches, scopes, and impacts.

The PWA, with its focus on long-term, large-scale infrastructure projects, served as a backbone of the New Deal. It aimed to tackle systemic issues by making significant investments in public works that would endure for generations. The substantial $3.3 billion budget allocated to the PWA reflected its ambitious goal of reshaping the American landscape.1 However, the PWA's emphasis on thorough oversight and long-term benefits often resulted in slow-moving processes, which hindered its ability to provide immediate relief to the burgeoning number of unemployed Americans.

In contrast, the WPA was born out of a need to provide immediate employment. Established in 1935, two years after the PWA, the WPA was part of Roosevelt's "Second New Deal." Its scope was broader in terms of the types of jobs created, catering not only to construction workers but also to professionals such as teachers, artists, writers, and musicians. Over its lifespan, the WPA employed an impressive 8.5 million people, a testament to its effectiveness in addressing immediate unemployment.2 Unlike the PWA's focus on large-scale projects, the WPA contributed to a diverse array of smaller projects that could be completed quickly, thus providing shorter-term but immediate employment.

The Civil Works Administration (CWA), on the other hand, was the most short-lived of the three, operating for merely five months in the winter of 1933-34. Instituted to counteract the immediate crisis brought on by the Great Depression's harsh winters, the CWA's primary aim was rapid employment. Through its allocation of $400 million from the PWA budget, the CWA sought to provide jobs to as many as four million workers.3 The urgency with which the CWA was rolled out meant that it bypassed many of the procedural delays that hampered the PWA. Yet, its temporary nature and high operational costs—more than $1 billion—led to its dissolution after fulfilling its initial purpose.

While both the PWA and WPA were instrumental in reshaping America's economic and infrastructural landscape, their methodologies and impacts were distinct. The PWA's projects were less numerous but typically larger and more enduring, contributing lasting value to American infrastructure. It functioned more as a strategic, high-impact initiative aimed at facilitating long-term recovery and growth. The WPA, through its focus on immediate job creation and a diverse array of works, embodied the New Deal's spirit of immediate relief and broad-based public engagement, addressing unemployment more directly and widely than the PWA.

The CWA, although brief, showcased the federal government's capability for swift action in a time of acute need. By putting millions to work within weeks, it alleviated the immediate hardship during a critical period, setting the stage for more sustained efforts by the WPA and, to some extent, the PWA.

Together, these programs highlighted both the potential and the limitations of federal intervention in times of economic crisis. The PWA's disciplined, large-scale approach built the physical backbone of modern America. The WPA, with its broad reach and diversity of roles, showed the importance of putting people back to work swiftly and in varied capacities. The CWA, though ephemeral, provided an instructive example of rapid emergency intervention. Collectively, they demonstrated a multifaceted strategy to combat economic woes, each contributing uniquely to the broader New Deal ethos.

Legacy and Long-term Impact

The Public Works Administration (PWA), despite its criticisms and challenges, undeniably left an indelible mark on American infrastructure and public policy. The lasting impact of its projects is evident in the continued use and appreciation of the infrastructure it helped build. The PWA's legacy is visible in the physical structures that dot the American landscape and in the philosophical and policy shifts it inspired in the realm of federal involvement in economic recovery and public works.

One of the most tangible contributions of the PWA was the vast array of infrastructure it facilitated. From monumental dams and highways to schools and hospitals, the PWA funded projects that became critical arteries of American life. The electricity-generating dams, such as the Grand Coulee and Hoover Dams, transformed arid lands into agricultural hubs and powered homes and industries, thereby spurring regional economic development that continued well into the 21st century.4 The electrification of the Pennsylvania Railroad between New York and Washington, D.C., revolutionized transport along one of the nation's most vital corridors, setting the standard for future railway developments.

The educational facilities built during the PWA era also had far-reaching effects. By funding the construction of thousands of schools, the PWA ensured that millions of young Americans had access to modern, safe, and conducive learning environments. This investment in education helped lay the groundwork for the subsequent economic boom post-World War II, as a more educated populace was better equipped to contribute to and benefit from an increasingly complex and industrialized economy.

Healthcare infrastructure projects funded by the PWA similarly contributed to public welfare. The construction of hospitals and clinics meant that medical care was more accessible, which in turn improved public health outcomes across the nation. These facilities played vital roles not only during the Great Depression but also during the war years and the subsequent baby boom, helping to manage the health needs of a growing population.

Perhaps the most lasting impact of the PWA was its policy legacy. The notion of federal intervention in economic recovery through public works became a cornerstone of American economic strategy, particularly during times of crisis. The PWA set a precedent for future programs, such as the Works Progress Administration (WPA) and the Tennessee Valley Authority (TVA), proving that substantial government investment could stimulate economic activity and create jobs.

The PWA's legacy also influenced the post-war era. The Federal-Aid Highway Act of 1956, which led to the creation of the Interstate Highway System, can trace some of its conceptual roots back to the New Deal era's public works initiatives.

In terms of public policy, the PWA's stringent standards and rigorous oversight set a benchmark for transparency and accountability in federal projects. Harold Ickes's insistence on preventing corruption, while occasionally slowing project approval, ultimately instilled a culture of responsibility in the management of public funds.5 This emphasis on oversight and quality became a model for future federal agencies and programs, ensuring that public investments were executed with integrity and long-term sustainability in mind.

The cultural and historical significance of the PWA cannot be overlooked either. The structures and facilities it helped create are woven into the fabric of American communities, serving as physical reminders of a time when collective effort and federal initiative were leveraged to combat economic despair. These projects are often celebrated as symbols of resilience and ingenuity, and many of them remain in use, serving new generations as they did past ones.

In the broader narrative of the New Deal, the PWA exemplifies the era's spirit of bold experimentation and proactive governance. It showcased the potential benefits and pitfalls of large-scale federal intervention and left a template for future initiatives aimed at economic recovery.

Color photograph showing water cascading down the spillways of the Grand Coulee Dam. The massive concrete structure and the roiling white water highlight the scale and power of this iconic PWA project.

The PWA's legacy is evident in the enduring infrastructure it helped build and the policy shifts it inspired. Its projects, from dams to schools, continue to serve communities, highlighting the lasting impact of federal intervention in economic recovery. The PWA stands as a testament to the power of collective effort and innovative governance during challenging times.

Side-by-side images showing a school built by the PWA in the 1930s next to the same school building still in use today. The older image is in black and white while the modern one is in color, but the structure is recognizably the same, highlighting the enduring legacy of PWA construction.